Original: $8.95
-70%$8.95
$2.68The Story
Constructed with premium paper material, this notebook features glued pages that can be easily torn out. The compact format of 14.8 x 14.8 cm is perfect for any on-the-go note taking needs. With space for 20 months of notes, the notebook includes a month grid on one page and a vertical layout for 30 days with an hourly schedule on two pages. It is an ideal tool for organizing projects and tracking habits.
- 80 pages
- 14.8cm x 14.8cm
- Made in Japan
About Sikigu
Sikigu is a thoughtfully designed brand by Taisei Shiki Mfg., dedicated to redefining the role of paper in modern life. Rooted in the Japanese term “Shiki-gu,” meaning “Paper-Tools,” Sikigu blends traditional craftsmanship with contemporary design to create functional, paper-based products for daily use.
View all Sikigu products we stock

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
Constructed with premium paper material, this notebook features glued pages that can be easily torn out. The compact format of 14.8 x 14.8 cm is perfect for any on-the-go note taking needs. With space for 20 months of notes, the notebook includes a month grid on one page and a vertical layout for 30 days with an hourly schedule on two pages. It is an ideal tool for organizing projects and tracking habits.
- 80 pages
- 14.8cm x 14.8cm
- Made in Japan
About Sikigu
Sikigu is a thoughtfully designed brand by Taisei Shiki Mfg., dedicated to redefining the role of paper in modern life. Rooted in the Japanese term “Shiki-gu,” meaning “Paper-Tools,” Sikigu blends traditional craftsmanship with contemporary design to create functional, paper-based products for daily use.
View all Sikigu products we stock

























